Area size 252.063 m2
Percentage of construction 8,16%
Ownership  
Location (distance of the industrial zone to the Municipality center) 1,5 km distance from the city of Strumica.
Infrastructure The infrastructure is under construction (water supply, sewerage and accessible roads).

  

No. of construction lot

Land area

Area foreseen for construction (m2)

Max allowed height up to attic (m)

Initial price of the land (den / m2)

Compensation for arrangement of construction land – price (den / m2)

Purpose

1.18.2 3.202 2.692 15     G2,G3,G4
3.18.2 6.887 4.821 15     G2,G3,G4
6.18.2 82 22 3     G2,G3,G4
8.18.2 913 639       G2,G3,G4
94.18.2 1.628 1.168 15     G2,G3,G4
97.18.2 18.502 12.955 10     B1
other 168.623 115.335       G2,G3,G4